Wednesday, March 23, 2005
HERNE HILL JUNCTION CHAOS
Ever since the new traffic lights were installed there have been huge tailbacks northbound (i) in Croxted Road (ii) in Norwood Road almost to Trinity Rise (iii) in Dulwich Road southbound
and (iv) the usual ones in Milkwood Road, Half Moon Lane and Herne Hill. These tailbacks last most of the day. At one stage the phase out of Dulwich Road was as low as 7 seconds. Several urgent calls have been made to the Engineers by the Herne Hill Forum Chair and local residents, and yesterday the northbound Norwood Road - Herne Hill railbridge phase was increased to 30 seconds. The pressure needs to be kept up as the problem is not yet resolved.
Ever since the new traffic lights were installed there have been huge tailbacks northbound (i) in Croxted Road (ii) in Norwood Road almost to Trinity Rise (iii) in Dulwich Road southbound
and (iv) the usual ones in Milkwood Road, Half Moon Lane and Herne Hill. These tailbacks last most of the day. At one stage the phase out of Dulwich Road was as low as 7 seconds. Several urgent calls have been made to the Engineers by the Herne Hill Forum Chair and local residents, and yesterday the northbound Norwood Road - Herne Hill railbridge phase was increased to 30 seconds. The pressure needs to be kept up as the problem is not yet resolved.
Subscribe to Posts [Atom]